top of page
Contract 006 Calle Lima Aerop. The Golden
Summary
Carry out the supply, extension and compaction of asphalt mixture P401 -PG 76-22 with polymer-modified asphalt type III, P403 with standardized asphalt 60-70, priming and bonding irrigation at the completion of the Lima taxiway at the El Dorado airport in Bogotá DC
Location
2023
Customer
6,971.40 SMMLV
Investment
Bogotá DC
Year of Completion
CONYTRAC SAS
bottom of page